Sometimes a product comes along that changes the game; Gripple have done just that with the Fast-Trak bracket system.
No hot works permits needed on sites, no handling of 3m + lengths of product, no offsite labour costs building expensive prefab bracketry – and a huge installation time saving too. This product will propel forward-thinking MEP contractors and installers to the front of the market, thanks to the significant advantages it boasts – and not least in the speed of install.
Talk to us about how the Fast-Trak could change the game for you.